Aircon Services
Aircon Installers Johannesburg Aircon Installation Aircon Repairs Aircon Service Aircon Regas Aircon Maintenance Aircon Cleaning
Problems & Replacement
Aircon Not Cooling Aircon Leak Repair Aircon Replacement Aircon Relocation
System Types
Split Unit Installation Inverter Installation Multi Split Installation Cassette Installation Ceiling Installation Ducted Air Conditioning VRF Air Conditioning
Residential & Commercial
Residential Air Conditioning Commercial Air Conditioning Aircon Supply and Installation Apartment Installation Body Corporate Installation
Property Types
Office Air Conditioning Shop Air Conditioning Restaurant Air Conditioning Warehouse Air Conditioning Industrial Air Conditioning Server Room Air Conditioning
HVAC & Ventilation
HVAC Contractors HVAC Installation HVAC Maintenance Ventilation Installation Bathroom & Toilet Ventilation Smoke Ventilation Core Drilling
Prices
Aircon Prices Johannesburg
Areas – Regions
East Rand Johannesburg South
Areas – Sandton & Surrounds
Sandton Bryanston Morningside Rivonia Sunninghill Woodmead Illovo Hyde Park Rosebank
Areas – Midrand & Far North
Midrand Kyalami Fourways North Riding
Areas – Randburg & Northcliff
Randburg Ferndale Northcliff Honeydew Weltevredenpark Melville
Areas – West Rand
Roodepoort Krugersdorp
Areas – East Rand Suburbs
Bedfordview Edenvale Kempton Park Germiston Boksburg Benoni Springs Alberton
Areas – Central & South
Houghton Rosettenville
Company
Reviews About Contact

Core Drilling Johannesburg

Get the best quote, fast
5-Star Reviewed
Home Core Drilling

Core drilling cuts a clean, round hole through brick, block or reinforced concrete using a diamond-segmented barrel rather than percussion. On air conditioning and ventilation work it is how pipework, condensate drains, cable and ducting get through a structure without cracking the plaster, spalling the face or shaking the building.

Send the hole sizes, the quantity and the material, and get core drilling quotes.

Get Core Drilling Quotes

Why Not Just Use a Hammer Drill

On a single-skin wall with a small hole and a forgiving finish, a hammer drill and a chisel will get you through. The trouble starts as soon as the wall gets thicker, harder or more visible.

Percussion works by breaking material away, so it takes the path of least resistance. On solid double brick it wanders, and on the far side it blows out a ragged hole considerably larger than intended, usually taking plaster with it. On rendered or face-brick elevations that is a patch that never quite disappears. On reinforced concrete it will simply stop when it meets steel.

A diamond core cuts rather than breaks. The hole is the diameter of the barrel, round, straight and clean on both faces, the surrounding finish is undisturbed, and it goes through steel rather than being stopped by it. On a finished building the difference in making good afterwards is usually larger than the difference in drilling cost.

It is also much less aggressive to the structure. There is no hammering transmitted through the wall, which matters in older masonry, in apartment blocks where the neighbours are on the other side of it, and anywhere with tiling, glazing or plaster that would rather not be shaken.

Wet and Dry Drilling

Wet drilling feeds water to the barrel. It cools the diamond segments, flushes the cut and controls dust almost completely, and it is faster and kinder to the bit. The downside is slurry: a grey, gritty water that has to go somewhere, which is entirely manageable on a building site and a serious nuisance in somebody’s finished flat.

Dry drilling uses a barrel designed to run without water and a vacuum shroud that captures the dust at the cut. It is slower, harder on consumables and therefore more expensive per hole, and it is the right answer inside occupied and finished spaces where slurry is unacceptable.

Most reputable contractors will do either and will tell you which they intend to use. If you are having work done inside a furnished apartment or an operating office, it is worth asking the question before the day rather than discovering the answer afterwards. Wet drilling on an upper floor also needs someone to have thought about where the water goes, because it finds its way through slab penetrations remarkably efficiently.

Slabs, Rebar and Post-Tensioned Concrete

Drilling through a wall is largely a question of finish. Drilling through a structural slab, a beam or a column is a question of structure, and it is where the genuine risk in this trade sits.

Reinforced concrete contains steel placed where the engineer needed it. A core can cut through reinforcement, but cutting the wrong bars in the wrong place weakens the element, so penetrations through structural members should be agreed with the engineer rather than assumed. That is normal practice on a commercial job and frequently skipped on small ones.

Post-tensioned slabs are the serious case. A good deal of Johannesburg’s newer commercial stock, particularly the office towers and parking structures through Sandton, Rosebank and the Midrand office parks, is built with post-tensioned slabs: high-tensile tendons held under very high load inside the concrete. Cutting one is dangerous at the moment it happens and extremely expensive to remedy afterwards. Slabs like these are scanned before anything is drilled, using a rebar scanner or ground-penetrating radar, and the penetration is positioned around what the scan finds.

If a contractor proposes to core a structural slab in a commercial building without scanning it first, that is the point to stop and get someone else. The scan costs a fraction of the consequences.

Scanning is worth doing on older buildings for a different reason as well: conduit, water pipes and drainage frequently run where nobody expects them, and the drawings, where they exist at all, are rarely a reliable guide to what was actually built.

Getting the Detail Right

Fall to the outside. A penetration carrying refrigerant pipework and a condensate drain should be drilled with a slight fall towards the outside face, so that anything running in the sleeve drains away from the building rather than into it. A dead level or, worse, a back-falling hole is a slow leak into a wall that takes a year to show up as a stain.

Sleeving and sealing. The hole wants sleeving and then sealing around the services once they are through, both to keep weather and insects out and to stop the penetration becoming a route for noise and air. Where the penetration passes through a fire-rated wall or floor, the seal has to be a rated one rather than ordinary silicone, and that is a specific product and a specific detail rather than a judgement call.

Size and position. A paired refrigerant run with insulation and a drain generally wants a larger hole than people expect, and getting it wrong means either a second hole or a compressed insulation that sweats. Ducting penetrations are larger again. It is worth having the aircon or ventilation contractor confirm the diameter and the exact position before the driller arrives, since a core in the wrong place is not something you can move.

Access. A hole three metres up an external wall is a different job from one at waist height, and the access arrangement, whether that is a ladder, a scaffold, a cherry picker or rope access, is frequently a larger line on the quote than the drilling itself.

Where This Comes Up in Johannesburg

The older solid-walled housing stock around Melville, Houghton, Rosettenville, Edenvale and the older East Rand suburbs is the domestic case. Double brick, sometimes with a plaster finish worth preserving, and no chance of a tidy result with percussion.

The commercial case is the office and parking stock through Sandton, Rosebank, Illovo, Woodmead and Midrand, where slabs are the thing being drilled and scanning is not optional. Add to that the inner-city office-to-residential conversions, where new bathrooms and kitchens need drainage and ventilation routes through slabs that were never designed to have them.

In sectional title blocks and complexes there is a governance layer as well: an external wall or a slab is usually common property, so a penetration through it needs body corporate approval before anyone drills. It is a short conversation if it happens first and an expensive one if it happens afterwards.

Core Drilling Prices in Johannesburg

Indicative ranges per hole, before access and scanning. Most contractors work to a minimum charge for the first hole and reduce sharply after that, so several holes on one visit is considerably cheaper per hole than one.

ScopeIndicative rangeNotes
32 – 52mm core, brick wallR450 – R1,200The usual aircon pipe penetration
32 – 52mm core, reinforced concreteR850 – R2,200Slower, harder on consumables
100 – 150mm core, brickR750 – R1,900Extraction duct through a wall
100 – 150mm core, concrete slabR1,400 – R3,500Scanning usually required first
200 – 300mm core, concreteR2,800 – R7,500Larger ducting and services
350 – 600mm core, concreteR6,500 – R18,000Rig anchoring becomes part of the job
Minimum charge or first holeR950 – R2,500Additional holes cost much less each
Rebar or post-tension scanningR2,500 – R9,500Per area scanned, before drilling
Dry drilling with dust extraction+20 – 50%For occupied and finished interiors
Access equipment, above ground levelR2,500 – R15,000Ladder, scaffold, hoist or rope access
Sleeving and sealing a penetrationR250 – R900 eachWeatherproofing and making good
Fire-rated penetration sealR650 – R2,500 eachThrough rated walls and floors
Body corporate applicationR0 – R2,500Penetrations through common property
After-hours or weekend work+25 – 60%Occupied offices and retail

Indicative ranges, not a quotation. Diameter, depth and material set the base figure, then access and scanning move it. The cheapest way to buy core drilling is to have every hole on the property marked up and drilled in a single visit rather than calling someone back for each one.

Get the actual number for your holes from local contractors.

Get Core Drilling Quotes

Frequently Asked Questions

Why core drill instead of using a hammer drill?

Because a core cuts and percussion breaks. On solid double brick a hammer drill wanders and blows out a ragged hole on the far side, usually taking plaster with it, and on reinforced concrete it stops when it meets steel. A diamond core produces a round hole the exact diameter of the barrel, clean on both faces, with the surrounding finish undisturbed and no hammering transmitted through the structure. On a finished building the saving in making good is normally larger than the extra cost of drilling.

Can you drill through a concrete slab?

Usually yes, but not without checking what is in it first. Reinforcement sits where the engineer put it, so penetrations through structural members should be agreed rather than assumed. Where the slab is post-tensioned, which is common in Johannesburg’s newer office and parking structures, it must be scanned before anything is drilled, because cutting a tendon is both dangerous and very expensive to put right. Any contractor proposing to core a commercial slab without scanning it is one to walk away from.

Will it make a mess inside my flat?

Not if it is done dry. Wet drilling is faster and cheaper but produces a grey slurry that is fine on a building site and unwelcome in a furnished room. Dry drilling with a vacuum shroud captures the dust at the cut and costs perhaps twenty to fifty per cent more per hole. Ask which method is planned before the day. If wet drilling is being done on an upper floor, also ask where the water is intended to go.

What size hole does an aircon installation need?

For a typical domestic split, a penetration in the region of 50 to 65mm covers the paired refrigerant pipes with their insulation plus the condensate drain, though it depends on the unit and how the installer intends to route it. Larger multi-split and ducted work needs more. The right approach is to have the aircon contractor confirm the diameter and mark the exact position before the driller arrives, because a core in the wrong place cannot be moved.

Does the hole need to slope?

Yes, slightly, and it is a detail that gets missed surprisingly often. A penetration carrying refrigerant pipework and a condensate drain should fall gently towards the outside face so that any water in the sleeve runs away from the building. A level or back-falling hole lets water track inwards along the pipes, and the result is a damp patch on an internal wall that takes months to appear and is then blamed on everything except the hole.

Do I need permission to drill in a complex or an office block?

Generally yes, because external walls, slabs and facades in sectional title schemes are almost always common property rather than yours. Most body corporates have a process, and it is normally straightforward if you start it before the work. In commercial buildings the landlord or building manager will usually want to know the position, the diameter and whether the slab has been scanned, and may require the work outside trading hours. Sorting that out first is much cheaper than being told to make good afterwards.

Related Aircon Services

Aircon Installers Johannesburg is a free quote-matching service. We do not install, repair or service air conditioners ourselves. Every quote comes from a LEADERR APPROVED local contractor, and your contract is with the business you appoint. Assess each quote on its own merits before appointing anyone.

Describe the job once and compare quotes from LEADERR APPROVED contractors in your area.

Get 5 Quotes

Get Core Drilling Quotes

Tell us the hole sizes, how many, and what you are drilling through.

Free to use, no obligation. Your request goes to LEADERR APPROVED contractors covering your area, who quote you directly.